Field/project development
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
With $9.6 billion in assets in the market, the focus is shifting from who is exiting Southeast Asia to who is positioning for entry through acquisition, according to Rystad Energy.
Shell has reached FID on LNG Canada Phase 2, a major expansion that will double the Kitimat facility’s LNG export capacity to 28 mtpa and strengthen long-term supply to growing Asian markets.
-
This paper describes the engineering design and operational execution practices that supported setting of a new extended-reach world record in a mature carbonate field offshore Abu Dhabi.
-
The $48.5-billion investment aims to keep the 30-year-old project in western Kazakhstan flowing for years to come.
-
The contractor will provide 17 pipeline centrifugal compressors for Aramco’s ongoing project in Saudi Arabia.
-
The contracts kick off another round of development in deep and ultradeep water off India’s east coast in the Bay of Bengal.
-
Dutch leaders have voted to halt all future production from the large gas field due to seismic activity linked to extraction operations.
-
The $6-billion Azeri Central East (ACE) platform is the first BP-operated offshore production facility controlled from onshore.
-
Kampala is drawing now on international experience to sidestep the “oil curse” before first crude flows from its Lake Albert developments.
-
The contractor will install the flowline and related subsea equipment later this year for the Talos Energy-led development.
-
Operator TotalEnergies wants to rework the EPC contract packages after initial bids challenged project economics.
-
Electric conversion of these offshore platforms is expected to cut about 1.2 million tonnes of CO₂ emissions per year.