Field/project development
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
With $9.6 billion in assets in the market, the focus is shifting from who is exiting Southeast Asia to who is positioning for entry through acquisition, according to Rystad Energy.
Shell has reached FID on LNG Canada Phase 2, a major expansion that will double the Kitimat facility’s LNG export capacity to 28 mtpa and strengthen long-term supply to growing Asian markets.
-
This paper discusses how multiple reliable technologies may be used in concert to establish reasonable certainty for reserves estimates through the flexibility provided by the Petroleum Resources Management System.
-
This study compares, in a carbon capture and storage (CCS) context, the economics of a traditional business model vs. an alternative business model (a regional CCS hub separately managed by a special-purpose vehicle).
-
It seems that it has been a very productive period for production and facilities. I reviewed a significant number of abstracts on such an interesting variety of topics—new technology developments down- and midstream, improvements in corrosion detection and prediction, new systems for emulsion monitoring, and even downhole drones.
-
This paper discusses how a traditional stochastic approach in project economics used for screening and ranking can sometimes limit management visibility of all possible outcomes in a project.
-
A surge in permit applications for long-term carbon storage sites reflects where industrially produced carbon dioxide can be harvested, and where the necessary pipelines are.
-
The contracts awarded by ExxonMobil and Equinor are for work offshore Guyana and Brazil.
-
The newbuild FPSO is destined for the giant Australian gas project in 2025.
-
A federal judge has upheld the Biden administration’s approval of the massive project on Alaska’s remote North Slope.
-
The four capital projects will enable Enterprise to send more NGLs to the Texas Gulf Coast.
-
Lac Da Vang is expected to deliver as much as 40,000 BOE/D at peak.