Field/project development
Nitzana will enable Israel to double gas exports to Egypt from the giant Leviathan gas field in the Eastern Mediterranean.
Supermajor BP awards contract to same specialists who commissioned its Argos platform.
Train 4 is expected to add 6 million tonnes per year of capacity to the South Texas liquefied natural gas project when it goes online in 2030.
-
Described as Brazil’s first-ever integrated SPS and SURF project, the development will include 19 wells, approximately 130 km of rigid risers and flowlines, and 35 km of umbilicals.
-
After 4-1/2 years out of service, the massive Wafra oil field in the Saudi-Kuwaiti Onshore Partitioned Neutral Zone, is set to resume production sometime soon and ensuring a smooth restart is no small order.
-
Topsides for the Peregrino C Platform in the Campos Basin offshore Brazil was installed by the world’s largest crane vessel, Heerema’s Sleipnir.
-
The plan will extend production of the largest field on the Norwegian Continental Shelf to 2040, while also deferring plans to decommission the Statfjord A platform. Statfjord A was originally scheduled to be decommissioned in 2022.
-
The approval clears the way for final investment decision on the offshore project, which includes a standalone FPSO expected to have a production capacity of 100,000 B/D. First oil is targeted for 2023.
-
The complete paper explores technical and economic development options to produce heavy-oil resources at commercial rates and showcases three optimization scenarios of higher recovery efficiency aimed at increasing net present value at the basin level.
-
The largest natural gas field in the rising Eastern Mediterranean region is now flowing after being discovered a decade ago.
-
The startup of the deepwater field marks the beginning of production from the massive Stabroek Block, which contains an estimated 6 billion BOE. ExxonMobil estimates that at least 5 FPSOs will be producing more than 750,000 BOPD from the Stabroek Block by 2025.
-
First oil from the 120,000-B/D Liza Destiny FPSO is flowing ahead of schedule.
-
Chevron has awarded Subsea 7 with a “sizeable” contract for subsea installation services at the St. Malo field in the US Gulf of Mexico. The scope of work will include project management, engineering, procurement, construction, and installation of the multiphase pump system at the field. It will also include a 14-mi water injection flowline system and the water inject…