Flow assurance
This paper details the importance and value derived from a real-time process-twin model for one of the world’s largest operating carbon dioxide sequestration projects.
This paper presents a comprehensive analysis of autonomous scale-management strategies implemented in the Buzios Field that eliminate the need for a well-service stimulation vessel by using existing facilities onboard the well rig.
This study demonstrates the transformative potential of physics-informed neural networks as a hybrid framework for multiphase flow measurement.
-
An investigator from the US National Energy Technology Laboratory examines the role remotely operated vehicles played in flow rate estimation from the Macondo well.
-
A look at techniques and technologies aimed at mitigating erosion issues from produced sand.
-
The accurate and precise analysis of scale inhibitors—in conjunction with other field data such as ion analysis, total suspended solids, and productivity index—plays an important role in making decisions about the efficiency of scale squeeze and continuous chemical injection treatments.
-
A former technical manager with Petrobras discusses the development of the company’s flow assurance philosophies and strategies.
-
The understanding of solid-particle flow regimes in pipelines for any operational conditions is important for identifying the nature of particle interaction and movement. In this paper, a comprehensive analysis of solid-particle flow regimes in stratified flow in a horizontal pipeline is presented.
-
Replicating field conditions for flow assurance experiments at a reasonable cost often presents many challenges, particularly when it comes to designing an experiment with appropriately scaled geometry, an expert said.
-
When the underlying cause of flow-related issues on offshore projects is unknown, an expert said an investigation of fluid flow behavior based on an understanding of the first principles of flow assurance is necessary.
-
Natural-gas-infrastructure reliability is critical for the energy sector. When capitalizing on old pipelines to transport natural gas, operators run the risk of partial blockage. In this study, the authors develop a multirate test method to detect partial blockage in a gas pipeline.
-
Subsea tieback of a new field to an existing offshore production facility is one option to minimize development costs.
-
This paper describes a new direct electrical heating method in flexible-pipe systems. The method effectively expands the operational envelope of flexible unbonded pipes with greater control of hydrate plugs and wax precipitation by distributed heating along the entire pipe length,