Asset Management
The deal adds 40,000 B/D of production and epands Cenovus’ SAGD footprint with three Alberta assets.
The Federal Reserve Bank of Dallas’ third-quarter energy survey reflects industry views on the drawdown of the US Strategic Petroleum Reserve, the outlook for Persian Gulf crude exports, and expectations for oil prices.
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
-
The discovery in Putumayo could benefit from nearby existing infrastructure.
-
The Anita Garibaldi was built by MODEC and will produce Marlim and Voador together with FPSO Anna Nery, already in operation.
-
Mukuyu-1 sidetrack proves a working hydrocarbon system in the Cabora Bassa basin.
-
Wellesley estimates that the drilling campaign has proved a developable gas-condensate accumulation of 60 to 100 million BOE.
-
The Uganda oil project envisions drilling more than 450 wells on 35 well pads, leading to an estimated production of 230,000 BOPD at its peak once production starts up.
-
The next phase of drilling is expected to resume in mid-2024 and includes several sidetrack wells, long-reach directional wells, and stratigraphic exploration wells.
-
Challenges to development, including costs, cited as reasons for turning back the acreage.
-
Jackup rig Borr Norve has started drilling operations on the project’s fourth production well, DHIBM-6H.
-
Fervo Energy’s bet that fracturing methods can be used for geothermal power is looking like a winner.
-
Additional milestones reached could add $14 million to purchase price.