Asset Management
Lower operating expenditures and a changing asset mix helped UKCS operators cut average production costs by 9% year over year, despite relatively flat production levels, according to the NSTA.
The deal adds 40,000 B/D of production and epands Cenovus’ SAGD footprint with three Alberta assets.
The Federal Reserve Bank of Dallas’ third-quarter energy survey reflects industry views on the drawdown of the US Strategic Petroleum Reserve, the outlook for Persian Gulf crude exports, and expectations for oil prices.
-
The award is for Equinor's BM-C-33 development in Campos Basin.
-
The construction of the CP2 LNG facilities in Cameron Parish is scheduled to start this year.
-
One expert says there needs to be a transfer of safety culture from the traditional energy industry to the newer offshoot of renewables.
-
The consortium will leverage the oil and gas industry's 100+ years of experience and technological developments in drilling and subsurface engineering to advance geothermal.
-
Shell and Equinor are progressing the project toward a final investment decision, which is expected later this year.
-
Contracts for the Uaru project’s FPSO and subsea installation were awarded to MODEC and Saipem.
-
The deal covers the supply of a subsea production system for the Uaru project in the country’s prolific Stabroek Block.
-
Offshore work related to the contract is slated to begin in 2024.
-
The authors of this paper discuss deep closed-loop geothermal systems as an alternative to traditional enhanced geothermal systems for green energy production that is globally scalable and dispatchable.
-
The first paper selected for this Intelligent Fields Technical Focus presents the use of a unique artificial-intelligence technique from the fourth industrial revolution—dual heuristic dynamic programming—to address business opportunities associated with optimization.