Asset Management
TotalEnergies signed off for 30% operated stakes in the Lang Lebah and B14 gas fields offshore Sarawak on the sidelines of ADIPEC in Abu Dhabi, while also highlighting methane-reduction partnerships in Angola, India, and Southeast Asia.
New rules requiring Mozambique’s LNG industry to supply 25% of production to the domestic market could stabilize gas deliveries to South Africa’s Secunda industrial center as the Pande and Temane gas fields near depletion.
The emerging vision is an industry where engineers focus on judgment, risk assessments, and accountability.
-
Operators aren’t rushing to drill, even as the closure of the Strait of Hormuz drives oil prices up.
-
The following three papers show challenges and potential solutions across various stages of the deepwater well-development cycle from a variety of deepwater basins across the world.
-
The authors describe a study on key technologies for intelligent risk monitoring of workover operations.
-
This paper establishes that the use of a dual-gradient fluid column during the running of large casing in an extreme-reach deepwater well is an effective method to overcome drag and enable the casing to reach total depth.
-
The authors write that by replacing outdated, labor-intensive processes with an integrated, cloud-based platform, companies can streamline planning, improve accuracy, and foster better coordination across teams and vendors.
-
The authors write that deployment of artificial-intelligence-based high-gas/oil ratio well-control technology enabled stabilization of well performance and maintenance of optimal production conditions.
-
This paper presents the first global application of autonomous drilling in deepwater and the journey to reach optimal drilling parameters, integrating proprietary tools from the project’s business partners.
-
In this paper, a case study is described in which a software solution enabled prescriptive optimization of well delivery using a physics-informed machine-learning approach for predictive identification and characterization of well-construction risks.
-
The paper describes the revalidation of a deepwater prospect that resulted in a no-drill decision.
-
This paper describes the integration of iterative torque/drag/buckling and hydraulic simulations for multiple tapered string combinations, the results of which guided the selection of a string configuration that deemed planned well total depths feasible.