Management
Months of due diligence and evaluation following proposed $18.7 billion deal results in no deal to purchase Australian operator.
Supermajor BP awards contract to same specialists who commissioned its Argos platform.
Train 4 is expected to add 6 million tonnes per year of capacity to the South Texas liquefied natural gas project when it goes online in 2030.
-
The government is offering up to $20 million to test applications that will shorten the time it takes to drill geothermal wells.
-
For the foreseeable future, going beyond the barrel will really mean maximizing returns from the barrel, including the identification and harnessing of potential gains from capital planning, asset management, and operations.
-
The French operator withdraws from flagship deepwater project.
-
The industry group called the decision by the court “misguided” and said it will result in significant uncertainty for Gulf of Mexico producers
-
The “merger of capabilities” is designed to accelerate growth in the region.
-
Highlights of what the US oil and gas chief said to SPE members at the recent Hydraulic Fracturing Technology Conference.
-
Two cruises were completed for DenAr Ocean Engineering for the TPAO Sakarya gasfield pipeline route investigation and site survey project.
-
The Lake Albert project includes the development of oil fields, processing facilities, and an electrically heated pipeline network.
-
The alliance ratified another modest daily production increase of 400,000 barrels.
-
Tested within a full ballast water tank on a North Sea FPSO, the ROV collected visual inspection data, validating system performance including wireless navigation and wireless communication.