Management
Plans call for license partner Aker BP to serve as operator during the development phase, with operatorship reverting to DNO after first oil in 2028.
Even as industry faces policy and tariff uncertainty, companies view spending on digital transformation as a driver of efficiency.
Geophysicist Markos Sourial discusses advances in seismic imaging, the challenges of modern data processing, and what they mean for the next wave of subsurface professionals.
-
The industry group called the decision by the court “misguided” and said it will result in significant uncertainty for Gulf of Mexico producers
-
The “merger of capabilities” is designed to accelerate growth in the region.
-
Highlights of what the US oil and gas chief said to SPE members at the recent Hydraulic Fracturing Technology Conference.
-
Two cruises were completed for DenAr Ocean Engineering for the TPAO Sakarya gasfield pipeline route investigation and site survey project.
-
The Lake Albert project includes the development of oil fields, processing facilities, and an electrically heated pipeline network.
-
The alliance ratified another modest daily production increase of 400,000 barrels.
-
Tested within a full ballast water tank on a North Sea FPSO, the ROV collected visual inspection data, validating system performance including wireless navigation and wireless communication.
-
This paper identifies success factors behind the Johan Sverdrup predrilling campaign and outlines lessons learned.
-
Exploratory, development well success in current onshore program.
-
Deal also includes commitment from Eni to drill four wells.