Management
The contract will cover the design and manufacturing of tree systems, flexible flowlines, a manifold, and controls, as well as installation of the subsea production system.
The Essington-1 well is the first discovery in the Otway since 2021.
The ruling means the state will take over permitting and enforcement of EPA regulations pertaining to all classes of wells, including injection wells for carbon dioxide storage.
-
The move to split oversight of Aramco from the Energy Ministry ends decades of tradition but is designed to avoid conflicts of interest ahead of what could be the largest IPO in history.
-
Recent exploration success in the North Sea has motivated Total to invest some $10 billion in the basin over the next 5 years.
-
With Norwegian authorities giving the go-ahead for startup, oil shipments from the massive Equinor-operated North Sea field could begin as soon as October, one month ahead of schedule.
-
Occidental drillers and engineers figured out that it is faster and cheaper to reduce the weight on bit (WOB) than speeding ahead, which increased the risk of a breakdown and time lost for repairs.
-
After the oil price downturn, operators placed renewed emphasis on spending discipline, in drilling, project costs, and balance sheets. For some, that was a different metric: return to shareholders over production growth.
-
Technology is an enabler. But why do some technologies get deployed while other seemingly superior technologies struggle to get traction?
-
Colombia is walking a thin line between becoming another fading petroleum province and Latin America’s next big success story. Its aces in the hole: unleashing its nascent offshore and unconventional sectors.
-
The growing popularity of model-based optimization work flows has resulted in an increase in their application to field cases.
-
The complete paper discusses a study in which the authors propose a joint field-development and well-control-optimization work flow using high-performance parallel simulation and commercial cloud computing.
-
The complete paper describes a physics-based model of interference and a sensitivity study to propose guidelines for well spacing and a drilling timeline for multiple horizontal wells in the Vaca Muerta shale.