Asset Management
Located along the North Sea, the Humber is expected to play a central role in the UK’s effort to achieve a net-zero emissions status by 2050.
The deal adds over 1,000 potential drilling locations and almost doubles oil production for Houston-based Magnolia.
The deal is the largest acquisition in Mitsubishi Corp.'s history and adds one of North America's leading shale gas assets to its portfolio.
-
The unit is flowing oil and gas from the Lula Extremo Sul area, 290 km off Rio de Janeiro state in 2150 m of water.
-
The oilfield engineering services industry continues to “wheel and deal” with Jacobs’ $3.3-billion sale to WorleyParsons.
-
The deal covers drawings, designs, and cast patterns for BEL’s anchor- and chain-handling equipment.
-
The two biggest oilfield services providers are enjoying a rebound in international activity but continue to struggle with a softening US shale completions market. While takeaway constraints will be temporary, steep shale production declines may emerge as a longer-term challenge.
-
An ATCE special session featured a range of perspectives on the importance of training beyond academic education in preparing new industry hires to develop long-term, sustainable careers.
-
The expansion is expected to boost production of the deepwater Gulf of Mexico platform by approximately 30,000 BOE/D. It is the fourth major upstream project to begin production for BP in 2018.
-
When it came to decide where to collect a critical sample of fractured rock, a new method for turning microseismic data into a heat map designed to display the most intense fracturing activity was considered.
-
Oil prices appear to have stabilized during the past year, and speakers at the annual Energy and the Economy Conference at the Dallas Federal Reserve Bank say they expect prices to remain level, at least for a little while.
-
The new venture will operate several deepwater assets—including the Cascade, Chinook, Medusa, and Thunder Hawk fields.
-
The North Sea field, which holds an estimated 300 million BOE in recoverable resources, is now scheduled to start production in early 2020. Operator Equinor said the timeline was based on its assessment of the remaining scope of work on the project.