Asset Management
Along with its Norway business, ConocoPhillips is divesting from its Teesside oil terminal in the UK, which it has used to process crude from the Ekofisk field for 50 years.
The sale of North Sea assets marks a decisive step in EnQuest’s transformation from a UK-focused operator to a Southeast Asia growth company.
German startup Telura's electric-pulse drilling system is designed to fracture granite without melting or vaporizing the rock.
-
Viper Energy is acquiring Sitio Royalties Corp. and its more than 25,000 net acres of royalty interests across major US shale plays.
-
Project expects a total of 19 additional modules to arrive on site during 2025.
-
Extensive acreage overlap and existing operational collaboration drove the acquisition decision.
-
This paper discusses the effect of injected-polymer viscosity on various aspects of a project, from recovery to surface facilities, including both theoretical arguments and practical field experience—which do not always align.
-
This study leverages oil-fingerprinting technology and geochemical data to evaluate the fluid connectivity between a main field and its stepout wells.
-
This work proposes a method to interpret far-field strain-change and pressure data to quantify fracture connectivity and properties at the cluster level.
-
Once labeled “undrillable,” Brazil’s heavy-oil Atlanta field in the Santos Basin faced technical, financial, and logistical challenges. But through a phased approach, clever reuse of assets, and disciplined project execution, Brava Energia transformed a risky deepwater asset into a producing field with 172 million BOE in 2P reserves.
-
New strides in computer vision, well controls indicators, and BOP alignment were showcased at the recent Offshore Technology Conference.
-
Updates about global exploration and production activities and developments.
-
The emergency permitting rules aim to accelerate geothermal energy development. Ormat Technologies' three Nevada projects will be the first to benefit from the streamlined process, with environmental reviews cut from years to weeks.