Asset Management
The loan to Arena Energy will generate an estimated 38,600 B/D in new production from 22 platforms in the Gulf.
This article from Murphy Oil outlines a modernization effort that resulted in increased scenario simulation capacity by five to 10 times.
The transaction is expected to strengthen the company's position in Alberta’s oil sands and unlock annual synergies of $54 million.
-
Extensive acreage overlap and existing operational collaboration drove the acquisition decision.
-
This paper discusses the effect of injected-polymer viscosity on various aspects of a project, from recovery to surface facilities, including both theoretical arguments and practical field experience—which do not always align.
-
This study leverages oil-fingerprinting technology and geochemical data to evaluate the fluid connectivity between a main field and its stepout wells.
-
Updates about global exploration and production activities and developments.
-
Once labeled “undrillable,” Brazil’s heavy-oil Atlanta field in the Santos Basin faced technical, financial, and logistical challenges. But through a phased approach, clever reuse of assets, and disciplined project execution, Brava Energia transformed a risky deepwater asset into a producing field with 172 million BOE in 2P reserves.
-
New strides in computer vision, well controls indicators, and BOP alignment were showcased at the recent Offshore Technology Conference.
-
This work proposes a method to interpret far-field strain-change and pressure data to quantify fracture connectivity and properties at the cluster level.
-
The emergency permitting rules aim to accelerate geothermal energy development. Ormat Technologies' three Nevada projects will be the first to benefit from the streamlined process, with environmental reviews cut from years to weeks.
-
Glenfarne has launched a strategic process to partner with global firms that can support execution and offer complementary expertise for the Alaska LNG project.
-
FPSO is the fourth unit to go online in the deepwater pre-salt Mero field in 3 years.