Asset Management
Operators struggle to understand proppant placement beyond the fracture, and that’s the information that could be the key to boosting EUR.
High-risk, high-reward projects focused on stimulation, enhanced recovery, and field-scale deployment are eligible under the DOE’s new UNLOCK initiative.
Industry forecasts point to increasing upstream expenditure and production, even as geopolitical volatility and smaller discoveries challenge project economics.
-
Project management is one way to keep an eye on the big picture. Focusing on the little things too can increase your bottom line. The complexity of modern facilities construction projects necessitates a cradle-to-grave approach to managing projects over long periods of time.
-
The oil and gas industry is technical and challenging. Because the technical issues are dealt with by humans, we also face social, psychological, and cognitive issues which are frequently as challenging. In this regular column, we address the softer side of engineering.
-
Facilities engineering has grown with the industry’s advance into deep water and the development of complex subsea systems to produce the resources found there.
-
Shell’s Parque das Conchas project, an ultradeepwater heavy-oil development in the northern Campos basin offshore Brazil, has won the IPTC Excellence in Project Integration Award. The award recognizes significant and unique achievements in managing and directing a project from discovery to delivery.
-
Earlier studies showed that the results of oil and gas megaprojects were quite similar to the results from other industries. More investigation shows a poorer track record, largely due to the poor functional integration that characterizes upstream project organizations.
-
The ultimate success of a deepwater project depends on phases from early concept selection, design, construction, commissioning, and startup to operation. However, the boundaries and transfer of responsibilities may not be sharply demarcated between phases.
-
Cost estimation for facilities depends on early concept selection and critical inputs, often complicated by uncertainty in one or more of the critical inputs. Empirical cost models and cost modeling methods using these inputs vary in degrees of scope, comprehensiveness, and robustness.
-
Final commissioning and initial startup was the source of lively discussion at a recent applied technology workshop held in New Orleans. A summary of key points is provided.
Page 400 of 401