Asset Management
Crude benchmarks spiked amid concerns that the US-Iran ceasefire is collapsing as commercial shipping comes under renewed attack.
The company’s millimeter wave drilling system is approaching a depth of 1 km at its Central Texas site. The recent funding is earmarked for Project Obsidian in Central Oregon, which Quaise calls the world’s first commercial superhot geothermal power plant.
Schneider Electric says the deal advances its vision of creating intelligent industrial ecosystems that connect physical assets with digital insights across the asset life cycle.
-
The authors of this paper analyze a robust, well-distributed parent/child well data set using a combination of available empirical data and numerical simulation outputs to develop a predictive machine-learning model.
-
This paper summarizes a collaborative industry study to compare observations between shale-play data sets and basins, develop general insights into parent/child interactions, and provide customized economic optimization recommendations.
-
In this paper, example machine-learning models were trained using geologic, completion, and spacing parameters to predict production across the primary developed formations within the Midland Basin.
-
The authors of this paper present the results of an assessment of two regions in Uruguay suitable for bottom-fixed offshore wind technologies.
-
Lebanon hopes to join the club of EastMed gas producers as TotalEnergies and its partners spud an appraisal well near Beirut’s maritime border with Israel where gas is already being produced.
-
The discovery in Putumayo could benefit from nearby existing infrastructure.
-
The Anita Garibaldi was built by MODEC and will produce Marlim and Voador together with FPSO Anna Nery, already in operation.
-
Mukuyu-1 sidetrack proves a working hydrocarbon system in the Cabora Bassa basin.
-
Wellesley estimates that the drilling campaign has proved a developable gas-condensate accumulation of 60 to 100 million BOE.
-
The Uganda oil project envisions drilling more than 450 wells on 35 well pads, leading to an estimated production of 230,000 BOPD at its peak once production starts up.