Asset Management
As the pace of new discoveries slows and high-quality prospects become harder to find, oil companies may need to rely more heavily on mature fields to maintain production and support future supply.
A shared digital mindset across subsurface, subsea, and drilling and wells is accelerating well planning at Vår Energi.
This guest editorial examines why geothermal projects require a different planning, financing, and development approach than traditional oil and gas projects.
-
Japan’s largest power generator is focused on sourcing Haynesville natural gas production for Gulf Coast export as LNG.
-
Oil and gas companies drilled 75 “high-impact” wells in 2024, representing 5.2 billion BOE.
-
Buoy-based camera footage, analyzed by artificial intelligence, can help reduce the risk of birds colliding with offshore wind farm turbines.
-
Over a dozen new projects aim to keep US offshore output near 1.8 million B/D through next year.
-
The Dutch marine contractor says it plans to outfit its construction vessels with small modular reactors over 5 years.
-
The $2.9 billion Shah Deniz Compression project, expected online in 2029, will enable additional production of around 50 Bcm of gas and 25 million bbl of condensate.
-
Viper Energy is acquiring Sitio Royalties Corp. and its more than 25,000 net acres of royalty interests across major US shale plays.
-
Project expects a total of 19 additional modules to arrive on site during 2025.
-
Extensive acreage overlap and existing operational collaboration drove the acquisition decision.
-
This paper discusses the effect of injected-polymer viscosity on various aspects of a project, from recovery to surface facilities, including both theoretical arguments and practical field experience—which do not always align.