Onshore/Offshore Facilities
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
SPE Offshore Europe 2027 has unveiled its conference theme, “(Em)Powering Europe: Securing Our Energy Future,” and opened the call for technical paper proposals for the Aberdeen event.
Flow measurement touches almost every phase of oil and gas operations. Yet the industry still struggles to distinguish between what is directly measured, what is inferred, and what is estimated through models, correlations, or assumptions. That distinction matters. A measurement does not need to be perfect to be useful, but it must be fit for purpose.
-
Russian oil major Lukoil expanded its Gulf of Mexico presence, acquiring a 50% operator interest in Mexico’s Area 4 offshore license area.
-
The latest move by Tellurian signifies a business model change from a financial partnership with LNG users to sales to traders.
-
With a boom in offshore wind construction expected to start in 2025, Subsea 7 is dealing now to grab a larger share of this burgeoning sector.
-
The first unmanned marine systems certificate has been awarded to SEA-KIT International by Lloyd’s Register, representing an important milestone for the maritime industry.
-
The swirling, sea-surface fire near the Ku-C platform was extinguished after several hours.
-
The Zama field was once considered the ideal result of Mexico's energy reforms that sought to bolster the country's oil and gas output by inviting private companies to participate in the energy sector.
-
The Gorgon gas project will consist of a new floating field-control station and subsea compression infrastructure.
-
The authors write that the road to decarbonization will involve several technologies working in concert, not the use of only one at the expense of others.
-
This paper describes strategies for mitigating asphaltene deposition using fiberglass-lined production tubing and the successful trials thereof.
-
How we think about the future of the pipe industry must evolve. How must tubular design and manufacturing change as we transition to clean energy? Geothermal energy is an area that needs attention and, further, needs very specific attention on tubulars.