Onshore/Offshore Facilities
A credible custody-transfer record depends on far more than the accuracy of a single meter. It is the product of an integrated measurement chain. While meter performance supports measurement-system integrity, commercial confidence also depends on traceability, governance, and authorization.
Despite significant progress in capturing associated gas for domestic use, Iraq remains the world’s third-largest gas-flaring country as it aims for higher oil and gas production targets.
The 2026 Upstream Scale Guidelines establish a common workflow for field measurements, scale modeling, and risk assessment to support more consistent operational decisions.
-
The complete paper develops a plausible physical model of the experimentally observed pseudoslug liquid-holdup phenomenon and models physical and hydrodynamic behavior using a dimensional regression modeling approach.
-
The charter agreement for the LNG-propulsion vessels is in line with Total’s Climate Ambition and will cut down on several emissions.
-
The data have been collected and analyzed from more than 18,000 equipment units with failure and maintenance records and includes information on subsea fields with more than 2,000 years of operating experience.
-
The subsea-technology company’s LUMA X subsea wireless communication modem will enable real-time streaming of HD-quality video and 4K images wirelessly through water, allowing the operators of autonomous underwater vehicles to monitor its interventions from its control rooms onshore.
-
Engie’s delayed supply contract with NextDecade’s Rio Grande LNG project is for 20 years. FID on the project is expected in 2021.
-
Cyberhawk will provide drone inspection, surveying, data visualization services, and inspection reports.
-
Future offshore oil and gas fields are likely to be satellite developments that emit less greenhouse gas because they do not require new production platforms. A new computational tool is now enabling the design of longer pipelines that will allow many more fields to be developed as satellites.
-
The Bureau of Safety and Environmental Enforcement approved the conversion of the Lena compliant tower platform into an artificial reef under the bureau’s Rigs to Reefs program.
-
The newly launched video series featuring speaker Bob Chin, the creator and editor of the OGF Savvy Separator Series of articles, provides a basic level of understanding of separator design and troubleshooting.
-
The LNG project includes development of offshore gas fields in Mozambique’s Area 1 and a liquefaction plant with a capacity in excess of 12 mtpa. The gas turbines are slated for delivery in 2H 2021 and 1H 2022, and the compressors are expected in 2021.