Onshore/Offshore Facilities
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
SPE Offshore Europe 2027 has unveiled its conference theme, “(Em)Powering Europe: Securing Our Energy Future,” and opened the call for technical paper proposals for the Aberdeen event.
Flow measurement touches almost every phase of oil and gas operations. Yet the industry still struggles to distinguish between what is directly measured, what is inferred, and what is estimated through models, correlations, or assumptions. That distinction matters. A measurement does not need to be perfect to be useful, but it must be fit for purpose.
-
Japan is bringing its nuclear reactors back on line following the suspension of operations at all reactors after the 2011 Fukushima accident. As the reactors return to full operation, the increase in nuclear generation is likely to displace generation from fossil sources, in particular natural gas.
-
The vessel will produce approximately 2.5 mtpa of LNG for the project, which is expected to deliver first gas in 2022.
-
The past year ended with a surge of subsea tree awards as E&P operators locked in lower supply-chain cost. Will demand continue to grow in 2019 and allow subsea OEMs to build backlogs and take back pricing power?
-
The need to optimize tank turnaround schedules is as great as it has ever been within the midstream sector, but traditional human-based tank inspections often cut into uptime while introducing safety risks. New robotic applications aim to alleviate these issues.
-
A newly launched JIP aims to bridge the BSEE and API frameworks and achieve industry consensus on the analysis and inspection data required to assess the feasibility of an extended service life.
-
The transfer of LNG to Equinor’s Arctic Voyager marks the first ship-to-ship transfer in the island nation.
-
Reducing a separation system’s footprint while increasing separation efficiency is demonstrated in an Oklahoma field trial.
-
Current production from the phase is 400 MMcf/D and expected to peak at 700 MMcf/D. A third phase also is slated to come on stream this year.
-
Poland’s PGNiG is calling for contractors for an LNG terminal expansion and construction of an additional jetty.
-
The jacket, constructed in Texas over 18 months, completed the journey on a 180-m-long barge across the Atlantic Ocean to the Mediterranean site in 28 days, arriving in late January.