Onshore/Offshore Facilities
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
A credible custody-transfer record depends on far more than the accuracy of a single meter. It is the product of an integrated measurement chain. While meter performance supports measurement-system integrity, commercial confidence also depends on traceability, governance, and authorization.
Despite significant progress in capturing associated gas for domestic use, Iraq remains the world’s third-largest gas-flaring country as it aims for higher oil and gas production targets.
-
This paper presents current advances in the development of a plasma-based milling tool and its use in casing-section milling for P&A.
-
This paper presents the challenges and obstacles faced in the use of a new technology for the plugging and deoiling of sections of unpiggable flowlines before decommissioning.
-
Techniques for well-abandonment log evaluations have been studied in the Gulf of Mexico since 2012. The new methods described in this paper consist of adding nuclear sensors to supplement the acoustic measurements and introduce novel processing methods.
-
Three case studies discuss the challenges of defining efficient facilities in difficult locations.
-
Lessons learned by the members of the SPE Separations Technology Technical Section, representing more than 250 years' experience, are presented so that the same mistakes are not repeated in the future.
-
Computational fluid dynamics modeling has proven promising for improving scrubber performance.
-
Bypass pigging has advantages over conventional approaches. Its application to multi-phase flow with high wax content crude is discussed.
-
Douglas-Westwood (DW) expects the expenditure of subsea vessel operations to begin a gentle upswing after next year.
-
In its fifth year, the Separations Technology Technical Section has grown to more than 1000 members. The new section chair provides his perspective on what the future holds.
-
Failure of a dry-gas seal in the compressor can result in plant outage and considerable revenue loss to the operating company. This paper discusses design considerations to minimize risk of failure.