Onshore/Offshore Facilities
Using case studies from Western Kazakhstan, this article shows how construction-led optimization cut installation costs by 60–70%, reduced construction scope by up to 80%, and lowered turnaround inspection labor by as much as 90%. The results improved schedule certainty, reduced risk, and increased efficiency across brownfield oil and gas facilities.
Production has begun at the company’s fifth FPSO-based development offshore Guyana just days after it sanctioned what will become its eighth project in the prolific Stabroek Block.
Of the eight ExxonMobil-led developments sanctioned to date in the Stabroek block, Longtail is the first to shift the focus from oil to gas and condensate production.
-
Angola expects an 18% rise in natural gas production by 2030 as global producers invest in offshore exploration and new field development.
-
The subsea field is part of the larger Snøhvit development in the Barents Sea.
-
BW Opal FPSO has capacity for 850 MMcf/D of gas, which will be treated and sent on to the Darwin LNG facility, and 11,000 B/D of condensate, which will transferred via tanker.
-
Marine contractor also approves the construction of a new heavy-transport ship.
-
Nitzana will enable Israel to double gas exports to Egypt from the giant Leviathan gas field in the Eastern Mediterranean.
-
Train 4 is expected to add 6 million tonnes per year of capacity to the South Texas liquefied natural gas project when it goes online in 2030.
-
Louisiana-based project will use operator’s Optimized Cascade process to turn feed gas into LNG.
-
Updates about global exploration and production activities and developments.
-
The offshore industry is actively embracing a digital-first, low-carbon future, supported by scalable demonstrators, intelligent systems, and integrated engineering approaches now entering precommercial or early-deployment stages.
-
This paper reviews the motivation and development of response-based forecasting from the perspective of the authors, reviewing examples and processes that have served as validation and led to modeling refinement.