Onshore/Offshore Facilities
Using case studies from Western Kazakhstan, this article shows how construction-led optimization cut installation costs by 60–70%, reduced construction scope by up to 80%, and lowered turnaround inspection labor by as much as 90%. The results improved schedule certainty, reduced risk, and increased efficiency across brownfield oil and gas facilities.
Production has begun at the company’s fifth FPSO-based development offshore Guyana just days after it sanctioned what will become its eighth project in the prolific Stabroek Block.
Of the eight ExxonMobil-led developments sanctioned to date in the Stabroek block, Longtail is the first to shift the focus from oil to gas and condensate production.
-
The Libra Consortium, led by Brazil’s Petrobras, has developed a method of separating carbon dioxide from reservoir fluids at the seafloor rather than the FPSO topsides.
-
Fresh commitments cover expansion work on the Al-Shaheen field that is expected to add 100,000 B/D of oil production once completed.
-
The Vineyard Wind 1 project came online on 2 January, while appeals in several lawsuits against it remain pending.
-
COP28’s “last in, last out” approach lets developing countries profit from oil and gas now to invest later in a clean energy future.
-
Republicans have been raising concerns for weeks about a possible administration clampdown on natural gas exports. Now that it’s official, expect the congressional pushback to intensify.
-
The contractor was tapped by Offshore Frontier Solutions to provide electrical systems and associated digital solutions for ExxonMobil’s fifth FPSO in the region.
-
In a sale agreement valued at $2.4 billion, Shell will move on from its Niger Delta upstream business which it has operated since 1979.
-
Heavy-lift and installation specialists will pre-install a mooring spread for upcoming Stabroek block FPSO.
-
The 100 million BOE-plus find will be tied back to the Heidelberg spar.
-
The Ksi Lisims floating LNG facility is planned to be the world's lowest emission-intensity LNG facility and net-zero ready by 2030.