Onshore/Offshore Facilities
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
A circular economy emphasizes reducing, reusing, recycling, and removing parts of existing systems to optimize them with respect to resource utilization. The following papers demonstrate how these pillars of a circular economy are enabling operators all over the world.
This study aims to systematically assess casing integrity and corrosion risks associated with CO2 injection in oil-recovery operations.
-
This paper describes the operator’s digital-twin end-to-end production system deployed for model-based surveillance and optimization.
-
The authors of this paper describe a project to develop a virtual sensor to monitor the cooling effect downstream of a subsea choke to avoid hydrate plugs during cold-start operations.
-
SLB is introducing a new electric well-control system to replace larger conventional, fluid‑controlled hydraulic equipment.
-
First LNG at Tellurian’ asset known as Driftwood LNG before Woodside’s acquisition last year is expected in 2029.
-
The UK North Sea Transition Authority has awarded the required permits for the East Irish Sea project, and the project has reached financial close. The carbon capture and storage project is expected to receive its first carbon dioxide in 2028.
-
A US government order has stopped building activity aimed at harnessing wind energy offshore New York.
-
Hammerhead, the seventh planned project offshore Guyana, is expected to reach FID later this year and go on-stream in 2029.
-
ExxonMobil and Guyana expect to approach 1 million B/D of oil as the ONE Guyana vessel reaches the Stabroek block.
-
The offshore Mauritania and Senegal project’s initial phase will deliver around 2.4 mtpa of LNG once fully commissioned.
-
The French major will supply the Caribbean country with LNG supplies while agreeing to take supplies from future Texas project.