Onshore/Offshore Facilities
After a record year for LNG project approvals in 2025, multiyear repairs to war-damaged liquefaction facilities in Qatar and the UAE threaten to slow the growth of global LNG capacity.
The declaration builds on a memorandum of understanding the partners signed with Egypt in May to process Block 10 gas at the country’s LNG export and domestic gas facilities.
Alongside the new subsea awards, Equinor strengthened its position in the 400-million-bbl Bay du Nord development by acquiring BP’s interest in the project.
-
The optimization model presented in the complete paper is the first multioperator offshore network-optimization model that considers decommissioning in the Netherlands.
-
The complete paper describes how various P&A designs can be compared by use of a risk methodology that takes account of degradation mechanisms, potential flow rates, and the effect on the environment.
-
Archer’s Stronghold Barricade well decommissioning system leaves the casing in place, while perforating, washing, and cementing the annulus to create a cement barrier in a single trip.
-
Rising oil production in the Permian Basin has created an opportunity for midstream companies to acquire and expand pipeline infrastructure to handle a predicted spike in produced water.
-
A JIP turned the dial closer to achieving all-electric subsea processing with the underwater testing of a subsea variable speed drive in a harsh water environment.
-
Large separators are often designed to meet the requirements of higher-capacity facilities. But these vessels bring with them consequences on the operating conditions over the full life cycle of a field.
-
The 9th International Conference on Gas Hydrates featured discussions on key advancements in flow assurance, including the concept of risk management and anti-agglomerates being applicable strategies in transient operations.
-
McDermott and CB&I will form a vertically integrated onshore-offshore construction and engineering services provider. Other deals include Jacobs Engineering Group acquiring CH2M and the expected close by year end of the Schlumberger and Weatherford OneStim JV.
-
If proven economic, solar EOR technology could represent an environmentally and energy friendly solution for California’s heavy oil producers.
-
ExxonMobil will lead the construction and operation of all future natural gas liquefaction and related facilities and assume midstream operations in Mozambique’s Area 4. Eni will continue to lead the Coral floating LNG project and all upstream operations.