Onshore/Offshore Facilities
Argentina’s President Javier Milei met with TotalEnergies CEO Patrick Pouyanné and Eni CEO Claudio Descalzi in Paris to discuss Argentina’s energy sector, including projects linked to the Vaca Muerta shale formation and the development of the Argentina LNG export project.
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
A credible custody-transfer record depends on far more than the accuracy of a single meter. It is the product of an integrated measurement chain. While meter performance supports measurement-system integrity, commercial confidence also depends on traceability, governance, and authorization.
-
Southwest Research Institute is adding a new facility to its capabilities in testing and evaluating subsea equipment and systems.
-
One of the oldest deepwater platforms in the Gulf of Mexico has become a profit-leader for the oil major during this downturn and is now a model for the company’s other floating assets.
-
Magnetic nanoparticles (MNPs) is a promising way to remove dispersed oil from produced water. In this study, the authors investigated the optimal operating conditions for MNPs and the mechanisms of MNP/oil attachments and magnetic separation.
-
AUVs aren’t limited to inspections and pipeline surveys. Deployment of a flotilla of AUVs to work on a project, and the communication among them, may someday lead to a subsea Internet of Things.
-
Innovations characterize the deepwater Moho Nord field development, recently brought on stream by Total in the Republic of Congo, and the project creates significant value for the country.
-
The need to offset declining production from mature basins, as well as the ability of international oil companies to access larger reserves with the use of new exploration-and-production technology, will continue to drive deepwater expenditure.
-
OriginClear agreed to a sales licensing deal for use of its Electro Water Separation technology at a Sinopec-operated shale gas site.
-
When companies are rewarded for short-term performance, there is little incentive to deal with long-term risks such as decommissioning. It’s so much easier to leave it for the future; but increasingly, that future is now.
-
This paper provides an insight into the challenges encountered and overcome during installation of 20 subsea structures, some close to 1000 t in weight and in water depths of up to 1350 m, for the Gorgon project offshore Western Australia.
-
The complete paper evaluates optimization techniques to develop, or support, business cases for intelligent or smart wells.