Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This study aims to systematically assess casing integrity and corrosion risks associated with CO2 injection in oil-recovery operations.
-
The Damietta LNG plant is expected online by June 2020. The plant will be owned by ENI, EGAS and EGPC.
-
Train 2 has a projected export capacity of 4 mtpa. Train 3 is expected to reach production in Q2 2020.
-
SPE’s technical sections offer communities rich with industry expertise. And your engagement adds to the wealth of knowledge to be shared.
-
The complete paper presents a practical approach for validating design-verification analysis for subsea equipment, using a representative pressure valve block to correlate finite-element analysis (FEA) predictions for strain changes with actual measured changes.
-
The complete paper describes the generation of additional fundamental solubility data under HP/HT conditions and comparison of the obtained values with several existing models.
-
Instead of burning money, why not make electricity? This is the big pitch being made by a growing number of technology companies who see green every time they see a red-hot flare burning associated gas.
-
Phillips and Trafigura JV expected to load VLCCs. The project is in the permitting stage with an FID expected this year.
-
OTC announces Distinguished Achievement Awards for 2020.
-
The transaction is expected to close in March. The Liberty Pipeline runs 700 miles between Cushing, Oklahoma and Guernsey, Wyoming.
-
AG&P breaks ground on Karaikal LNG.