Onshore/Offshore Facilities
The declaration builds on a memorandum of understanding the partners signed with Egypt in May to process Block 10 gas at the country’s LNG export and domestic gas facilities.
Alongside the new subsea awards, Equinor strengthened its position in the 400-million-bbl Bay du Nord development by acquiring BP’s interest in the project.
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
-
This paper analyzes the various selection methods of integrated template structures (ITSs) for use in the Arctic environment. Operation and installation of subsea modules in the Barents Sea are also analyzed in this paper.
-
As production from mature basins onshore and in shallow water declines, the development of deepwater reserves has become vital. Consequently, production and Capex are expected to rise.
-
The application of lessons learned in projects is generally a trusted approach to tackling design challenges. However, the design of onshore production systems for unconventional resources does not allow for straightforward crossover from onshore or offshore conventional to unconventional systems.
-
Decommissioning costs are often made higher by decisions made during the initial engineering and construction stages of an offshore oil or gas field. Designing with a critical eye can go a long way toward reducing the decommissioning costs, which occur decades later.
-
Engineers who design separators often use rules of thumb. While useful, the theoretical guidelines are typically written for downstream separators and are difficult to apply to the changing dynamics of upstream field conditions.
-
This paper provides an overview of an engineering-design methodology that can be followed for tubular-equipment sizing and selection for use in complex wells.
-
This paper will demonstrate the benefit of liner-drilling technology used to drill and cement an operator’s 9⅝- and 7-in. liners in place.
-
Results from a well recently drilled into an underpressured reservoir in southern Mexico.
-
The NORSOK standard focuses on the establishment of well barriers and well-barrier elements, and how these are accepted and monitored to prevent loss of well integrity that ultimately could lead to a loss in wellbore-fluid containment.
-
This paper reviews the mechanisms of initiation and the prevention of top-of-the-line corrosion (TLC). Recent research and developments are highlighted and validated to arrive at best practices for control of this significant corrosion manifestation.