Pipelines/flowlines/risers

Williams' acquisition of Momentum Midstream creates a larger, more connected Gulf Coast gas network capable of meeting surging demand from LNG export facilities, power generators, and industrial users.
This paper details the design and implementation of a subsea multiphase pump solution deployed in the Atlanta field designed to maximize reuse of existing subsea and topside equipment.
This study aims to systematically assess casing integrity and corrosion risks associated with CO2 injection in oil-recovery operations.

Page 10 of 34