Pipelines/flowlines/risers
New rules requiring Mozambique’s LNG industry to supply 25% of production to the domestic market could stabilize gas deliveries to South Africa’s Secunda industrial center as the Pande and Temane gas fields near depletion.
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
-
The pipeline project was completed in September but whether it will flow is now as uncertain as ever as both Germany and the US seek to shut the project down.
-
Oil production is reaching new levels in the Permian Basin and it has created some uncertainty about where all the associated gas will go.
-
The new project will use EnLink’s existing pipeline infrastructure and Talos’ newly acquired 26,000-acre sequestration area.
-
Two cruises were completed for DenAr Ocean Engineering for the TPAO Sakarya gasfield pipeline route investigation and site survey project.
-
The Lake Albert project includes the development of oil fields, processing facilities, and an electrically heated pipeline network.
-
The facility will be a commercial-scale CO2 sequestration hub in the DJ Basin.
-
The new 165-MW facility uses flare gas from the adjacent Sarqala field to generate power for local use.
-
EDF and Carbon Mapper find more than two dozen facilities producing the same near-term climate pollution as about 500,000 passenger vehicles.
-
Design, construction specialist books new work in the Middle East, Australia, and Saudi Arabia.
-
The acquisition gives Enterprise’s natural gas and NGL business an entry point into the Midland Basin.