Production
Acting director of the new center Ale Hakala outlines the research priorities guiding the newly established center’s focus on production enhancement technologies.
Opening day remarks from President Mohamed Irfaan Ali framed fossil fuels and renewables as parallel systems amid rising demand and structural supply pressures.
The UAE will prioritize national interests and production flexibility, setting up implications for OPEC’s market power, oil, prices, and global supply dynamics.
-
A challenging commodity price environment has forced operators to seek methods for sharply lowering recovery cost per barrel of oil equivalent (BOE) in unconventional plays.
-
The surge in unconventional completions has created a substantial accumulation of previously hydraulically fractured wells that are candidates for hydraulic refracturing.
-
A matured field is currently producing with greater than 85% water cut (WC) and has significant levels of uncertainty with respect to oil/water contact (OWC), flank structure, depth of spill points, production allocation, and residual oil saturation.
-
One of the most promising targets for resource-rock stimulation in South America is the Vaca Muerta (VM) shale in western Argentina.
-
Liquid loading is a common production problem in mature gas wells. Correct prediction of the critical gas velocity at which the well starts to load is very important for taking action to prevent premature loss of production.
-
As part of a project that involves the use of four artificial islands to drill and complete more than 300 extended-reach-drilling (ERD) wells in a giant offshore oil field, several completion designs have been piloted for brownfield development.
-
In a riserless-light-well-intervention (RLWI) operation in the Gulf of Mexico (GOM), a crown plug failed to release.
-
Although refracturing is a topic that has gained a lot of interest, many shale producers have been sitting on the sidelines because early results did not justify the spending
-
Production engineers are often asked to manage both the artificial lift (AL) system and the upstream chemical injection program for a project.
-
A panel of experts says US shale producers need to rethink their drilling and completion designs as problems mount for horizontal wells when they go on pump. Hanging in the balance is whether long-term production from many shale wells will be achievable.