Reservoir
Average output reached 13.6 million BOPD, extending a period of sustained growth that has kept the US at the forefront of global oil production.
A report commissioned by Havtil, the Norwegian Ocean Industry Authority, calls for better dialogue regarding pore-pressure uncertainty and higher-end drilling techniques like managed pressure drilling as methods to reduce the risk of well-control events.
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
-
A challenging problem of automated history-matching work flows is ensuring that, after applying updates to previous models, the resulting history-matched models remain consistent geologically.
-
This paper presents a work flow to match the history of reservoirs featuring complex fracture networks with a novel forward model.
-
Frac water disinfection experts become De Nora service arm in the unconventional oil and gas market.
-
Data volumes are growing at an exponential rate. How can high-performance computing solutions help operators manage these volumes? Will faster, stronger processors and cloud computing solutions be the answer?
-
This paper describes interpretation results of a 4D seismic-monitoring program in a challenging Middle East carbonate reservoir.
-
This paper outlines the value of 4D for reducing uncertainty in the range of history-matched models and improving the production forecast.
-
This paper discusses a project with the objective of leveraging prestack and poststack seismic data in order to reconstruct 3D images of thin, discontinuous, oil-filled packstone pay facies of the Upper and Lower Wolfcamp formation.
-
Last year saw continued contraction in the seismic data-acquisition industry. With this drop in acquisition business, fewer seismic data-acquisition papers were published. Nevertheless, three very good SPE papers covering important acquisition and processing topics are featured here.
-
Production growth in the Permian Basin requires drill rigs running at a high pace. That is challenging companies to push well productivity.
-
The agency updated its methodology and production volume estimates to factor increasing production from new, emerging plays as well as older plays that have rebounded thanks to drilling advancements.