Floating production systems
This paper explores the application of a modular, high-temperature gas-cooled nuclear reactor to a Very Large Crude Carrier-class floating production, storage, and offloading vessel.
After launching pre-salt production in Brazil, the ultradeepwater Tupi asset has become one of Petrobras’s most productive.
The $5.1 billion ultradeepwater project is Angola’s first integrated cross-block development and sits at the top of Azule’s Southern African portfolio.
-
The Norwegian operator engaged BW Offshore and Altera Infrastructure to take a run at a development scheme for the project.
-
At peak, 100,000 BOE/D is expected to flow to the Whale production semisumbersible, which largely replicates the Vito semi.
-
After overcoming the challenges of a new offshore frontier, BP has begun first gas flow at its ultradeep project offshore Mauritania and Senegal.
-
The first two wells at Brava Energia’s Atlanta field are producing, with four more to be connected this year.
-
After being a non-factor in the energy industry for years, the country is now one of the fastest growing regions.
-
First oil from Beacon Offshore’s Shenandoah is on track for the second quarter of 2025. Project partners also have sanctioned a second phase of development and are advancing plans for a related project.
-
Deepwater subsea tieback expected online by the end of the decade, targeting more than 300 million BOE.
-
This paper presents the operator’s learnings in evaluating the routine of a floating production, storage, and offloading asset crew to identify scenarios for the application of robotics in day-to-day offshore activities.
-
FPSO to be connected to high-pressure subsea separation technology pilot project.
-
Petrobras said the unit serving the pre-salt field is designed to reduce up to 24% of emissions.