Floating production systems
Production has begun at the company’s fifth FPSO-based development offshore Guyana just days after it sanctioned what will become its eighth project in the prolific Stabroek Block.
Of the eight ExxonMobil-led developments sanctioned to date in the Stabroek block, Longtail is the first to shift the focus from oil to gas and condensate production.
New rules requiring Mozambique’s LNG industry to supply 25% of production to the domestic market could stabilize gas deliveries to South Africa’s Secunda industrial center as the Pande and Temane gas fields near depletion.
-
After being a non-factor in the energy industry for years, the country is now one of the fastest growing regions.
-
First oil from Beacon Offshore’s Shenandoah is on track for the second quarter of 2025. Project partners also have sanctioned a second phase of development and are advancing plans for a related project.
-
Deepwater subsea tieback expected online by the end of the decade, targeting more than 300 million BOE.
-
This paper presents the operator’s learnings in evaluating the routine of a floating production, storage, and offloading asset crew to identify scenarios for the application of robotics in day-to-day offshore activities.
-
FPSO to be connected to high-pressure subsea separation technology pilot project.
-
Petrobras said the unit serving the pre-salt field is designed to reduce up to 24% of emissions.
-
Contactor will provide EPCI work related to the subsea portion of the 20K Gulf of Mexico development.
-
The field's massive FPSO is anchored in place and on schedule for first oil prior to year-end.
-
As Hurricane Francine bore down on the central Louisiana coast, production in the Gulf of Mexico took a hit.
-
The updated plan seeks to avert termination of the PSA by raising total investment and constructing a floating production unit at Aphrodite plus an export pipeline to Egypt.