Floating production systems
New rules requiring Mozambique’s LNG industry to supply 25% of production to the domestic market could stabilize gas deliveries to South Africa’s Secunda industrial center as the Pande and Temane gas fields near depletion.
Argentina’s President Javier Milei met with TotalEnergies CEO Patrick Pouyanné and Eni CEO Claudio Descalzi in Paris to discuss Argentina’s energy sector, including projects linked to the Vaca Muerta shale formation and the development of the Argentina LNG export project.
With confidence in subsea boosting performance growing, BP is incorporating pumping systems into both greenfield developments and brownfield expansions.
-
Discovered in 2010, the Búzios field offshore Brazil achieved a new milestone with the installation of its sixth production facility.
-
The floating production, storage, and offloading vessel is the first in the world with a postcombustion carbon capture pilot system.
-
The Tiber FPU is expected to follow the Kaskida hub currently being built in Singapore.
-
The new Sevan-designed cylindrical FPSO is expected to flow 45,000 BOE/D at peak.
-
The Norwegian operator engaged BW Offshore and Altera Infrastructure to take a run at a development scheme for the project.
-
At peak, 100,000 BOE/D is expected to flow to the Whale production semisumbersible, which largely replicates the Vito semi.
-
After overcoming the challenges of a new offshore frontier, BP has begun first gas flow at its ultradeep project offshore Mauritania and Senegal.
-
The first two wells at Brava Energia’s Atlanta field are producing, with four more to be connected this year.
-
After being a non-factor in the energy industry for years, the country is now one of the fastest growing regions.
-
First oil from Beacon Offshore’s Shenandoah is on track for the second quarter of 2025. Project partners also have sanctioned a second phase of development and are advancing plans for a related project.