In the Eagle Ford, an integrated approach to engineering and operations was key to optimize performance and improve understanding of the area. Application of technology and standardization of operations resulted in continuous performance improvement. Detailed planning and execution, application of rotary-steerable systems (RSSs), implementation of an optimized casing design, contractor performance management, clear and open communication within the team, and implementation of a performance incentive plan all played a part in the overall drilling-performance improvements.
Challenges
Although drilling operations were under way in the area, it was found that existing drilling practices and designs were not well-suited for this well type. At the start, there was a lack of standardization in planning, execution, and communication between office and field staff.