The term “bright skies” generally connotes optimism, except when used to describe the skies at night. Finding a naturally dark sky has become increasing difficult as the global population and development grows.
-
Upstream separation processes remain a hot topic for facilities engineers. Striving to design separators with the optimal sizing for a variety of reservoir conditions, increasing water cuts, and dynamic gas/oil/water production characteristics is critical, but challenging.
-
With events such as the BP Macondo blowout in the US Gulf of Mexico (2010) and the Pemex Ayatsil-C platform accident (June), the safety risks inherent in oil and gas projects are evident.
-
Although the commissioning of a floating production system (FPS) generally takes place between the “mechanical completion” and “first oil” stages, commissioning activities begin long before then.
-
LLOG Exploration’s Delta House floating production system (FPS) looms large over Kiewit Offshore Services’ fabrication yard in Ingleside, Texas.
-
A rigorous SHE&S program on the Barzan Onshore Project tracked 211 deliverables on a monthly basis and led to 131 million man-hours worked without a lost-time incident from July 2012 to March 2014.
-
The past and future decade: Industry leaders Eve Sprunt and Luis Rodriguez speak their minds on a host of industry topics.
-
After severe damage in a typhoon, the Huizhou oil field in the South China Sea was back on production in 5.5 months. This paper reviews how this feat was accomplished.
-
While storage and logistics are critical elements of the viability of water reuse, if the water chemistry is not fit for gel fracturing formulations, it will not matter how much is stored in centrally located impoundments.
-
Over the next 5 years Douglas-Westwood (DW) expect USD 122 billion to be spent on global subsea vessel operations—an increase of 64% compared with the previous 5-year period.