Testing page for app
-
A 2D computational fluid dynamics model is extended to a 3D submodel and validated to provide detailed information on the state of the standing valve as a function of time to assist in sucker rod pump design and operation.
-
BW Opal FPSO has capacity for 850 MMcf/D of gas, which will be treated and sent on to the Darwin LNG facility, and 11,000 B/D of condensate, which will transferred via tanker.
-
Marine contractor also approves the construction of a new heavy-transport ship.
-
Nitzana will enable Israel to double gas exports to Egypt from the giant Leviathan gas field in the Eastern Mediterranean.
-
Nearly 90% of investment since 2019 has gone to replacing lost production, with $570 billion in spending projected for 2025.
-
The agency’s administrator said the program “does nothing to improve air quality.”
-
Months of due diligence and evaluation following proposed $18.7 billion deal results in no deal to purchase Australian operator.
-
The project is expected to recover up to 300 MMscf/D of flared gas. Plans call for the recovered gas to be converted into treated dry gas, liquefied petroleum gas, and condensate for domestic use and export.
-
The current free collections presented by the online library examine artificial lift and various aspects of reservoir evaluation.
-
This year, 14 individuals joined this elite group, bringing the total membership of A Peer Apart honorees to 235 dedicated members.