Testing page for app
-
This paper provides an operator’s viewpoint of in-well monitoring, covering some of the key challenges.
-
During the 10-year period between 2003 and 2013, Mexico drilled 30 deep- and ultradeepwater wells in water depths ranging from 512 to 2900 m.
-
Espirito Santo: Design and Operational Experience of the Use of Steel Risers on a Turret-Moored FPSOThe floating production, storage, and offloading (FPSO) facility Espirito Santo, located offshore Brazil in the Parque das Conchas (BC-10) field, is the world’s first turret-moored FPSO facility to use steel risers for fluid transfer.
-
A new intelligent model that successfully learns from high-dimensional data and effectively identifies high-production areas and optimum lateral-re-entry candidates is presented.
-
For thin-oil-rim reservoirs, well placement, type and path, and well-completion methods, should be evaluated with close integration of key reservoir- and production-engineering considerations.
-
Artificial-intelligence (AI) -based methods have become mainstream engineering, and we as practitioners need to have a firm understanding of the principles and be ready to apply them when the opportunities arise.
-
Al Khalij field offshore Qatar is formed of a highly heterogeneous carbonate reservoir with significant remaining dynamic uncertainties.
-
Our industry’s demonstrated ability to innovate and continually improve well-construction technology will be all the more valuable to all plays if low oil prices persist, but especially so for shale and other high-cost-per-barrel plays.
-
This study examines the effects of drilling, completion, and production operations and their associated cyclic stresses on a cement sheath.
-
The combination of ultrasonic pulse-echo and flexural-attenuation measurements was adopted in this project in the South China Sea for cement-integrity evaluation.