The methodology has proven to be a powerful and effective tool for major-risk management. This paper describes how this technique has been used for the management of major risks associated with production at Total’s Akpo floating production, storage, and offloading facility.

total-akpo-fpso.jpg
The Akpo FPSO.
Credit: TechnipFMC/Courtesy of Total.

As the world’s energy demand continues to increase, the industry faces even more challenges in terms of safety and environment risks associated with meeting this demand. Over the years, the focus had been on managing risks of high occurrence and low consequence, whose effectiveness is monitored with indicators such as total recordable injury rate (TRIR) and lost time injury frequency (LTIF). Although the offshore industry has been successful at reducing these occupational incidents, not much improvement has happened in major accidents trend globally. The proposition is that relying on safety management system is less effective for major accident prevention. However, the North Sea has seen a reduction in major accidents, with two total loss events over 8 years and none in the subsequent 25 years period, which DNV attributes to the focus on barriers.

Among several barrier management techniques, the Bow Tie method, first published in Europe by Shell, is considered to be superior on the basis of its features, including providing a quick visual perspective of an accident scenario, which aids communication to staff and contractors; providing a listing of safety and environmental critical barriers; and providing a clear map of people responsible for implementing barriers. With recent advancements in the use of Bow Tie technique, including monitoring of barrier degradation and dynamic risk profiling extensively covered in this paper, barrier management methodology proves to be a powerful and more-effective tool for major risk management. This paper describes how this technique has been used for the management of major risks associated with oil and gas production in Total’s Akpo floating production, storage, and offloading (FPSO) facility offshore Nige­ria at a sea depth of approximately 1,400 m. The FPSO system consists of subsea wellheads and flow lines, umbilicals and risers to the FPSO topside, mani­folds, four-stage separation (two trains), gas compression, reinjec­tion and export, condensate storage, and utilities. The Akpo FPSO came on stream in March 2009 and currently produces approximately 180,000 BOPD of condensate and 300 million scf/D of gas.

From the Akpo major risk study conducted in line with Total’s technological risk assessment specification, the following major accident scenarios (scenarios with potential loss of more than one life, significant damage to environment, or asset damage of more than €10 million were identified:

  • Flammable liquid and gas processing/handling on topside: topside loss of containment
  • Subsea wells: well blowout/ uncontrolled release
  • Passing/visiting/support vessels ship: collision/impact with the FPSO
  • Pressurized hydrocarbon in subsea equipment: subsea loss of containment
  • Crude oil offloading operation: loss of containment
  • Catenary anchor leg mooring  buoy in open sea: impact/collision damage to buoy
  • Helicopter operations (landing and takeoff): helicopter loss of control
  • FPSO station keeping: loss of FPSO mooring lines
  • Object at height/lifting operations: dropped object on topside/overboard
  • Accumulation of liquid in flare knockout drums: liquid carryover to the flare
  • Warehouse: operating electrical equipment/stored flammable products, warehouse fire
  • Storage and handling of crude oil in cargo tank: cargo tank fire/explosion/implosion
  • Flammable gas/smoke: gas/smoke ingress in manned areas
  • FPSO hull structure loading: structural failure/ total loss of FPSO

The risks associated with these scenarios were demonstrated to be as low as reasonably practicable (ALARP), implying that residual risk is tolerable. This position of safety is maintained as long as the safety measures and systems taken into consideration by design and in operation are indeed available and reliable. These measures, called safety critical barriers, consist of programs for testing and maintenance of safety and environment critical equipments, programs for performing safety critical activities as well as programs for implementing other risk-management tasks identified during risk reviews or audits.
The Line Department is responsible for ensuring the implementation and maintenance of the barriers, and, as such, each barrier is assigned to a Line staff that is trained and well-informed on his responsibilities. On a quarterly basis, a verification exercise is conducted to establish the veracity of the barrier maintenance functions as well as identify improvement opportunities in the management of barriers.

To prevent the occurrence of major accidents on the installation, these barriers must be implemented, monitored, and maintained. In this paper, two aspects of monitoring are addressed:

  • Monitoring of deterioration or degradation of barriers
  • Monitoring of cumulative effect of the degradation of barriers on a major accident scenario in terms of risk picture

A visual risk-management tool with the following benefits is deployed for the implementation of this process:

  • Creating a diagrammatic portrait of potential accident paths
  • Providing opportunities for quick identification of failing barriers
  • Enabling understanding of the criticality of failing barriers in relation to potential accident scenarios
  • Creating a dynamic profile of risks based on changes in the reliability of barriers