Latest News
-
Increasing gas demand and the requirement for short-term to medium-term import solutions have led to rapid growth in the floating regasification sector in recent years.
-
This paper presents the results of tests conducted to design a fast-breaking gelled fluid for a debris-removal operation in a long, large-diameter subsea pipeline in the Asia Pacific region. where traditional pigging was not an option.
-
Global decommissioning projects are ramping up as many installations near the end of their life cycle. Many operators are now planning for major removal projects. Changes in technology and regulations have caused operators to make significant shifts in well abandonment operations.
-
Semoga and Kaji fields experienced reservoir souring and suffered a history of calcium-carbonate (CaCO3) -scale cases before a proper scale-inhibition program was implemented. Problems with a free water knockout discovered continued scale issues, leading to investigation of the reasons.
-
This paper provides details of comprehensive computational-fluid-dynamics (CFD) -based studies performed to overcome the separation inefficiencies experienced in a large-scale three-phase separator.
-
Changing the salinity of injection water could make the difference in getting more out of existing wells.
-
Using low-sal water for flood can add 30% to the amount of oil that can be recovered from a reservoir. What is the theory behind it?
-
A recent webinar covered the varieties of current technology for flotation equipment and provided an in-depth look into flotation technology and the options surrounding offshore applications.
-
This paper highlights the issues and challenges surrounding pipeline trenching and burial in ice-gouge environments. The current state of practice is discussed along with the technology gaps that need to be addressed.
-
This regular column addresses the social side of engineering. We are pleased to include an article written by two of the more prominent names in decision-theory research. Dale Griffin and Thomas Gilovich describe interesting and important insights from the study of heuristics and biases.
-
Bridging the gap between facilities and reservoir engineers is critical in designing systems that are flexible enough to allow a spectrum of reservoir feed conditions to be accommodated over the life cycle of the field. While subsurface uncertainties can't be eliminated, they can be managed.
-
I extend a warm welcome to 2013, which henceforth will be known as the year of the facilities engineer. We are playing a more important role today than we ever have in the delivery of hydrocarbon assets to meet the world’s energy needs.
Explore Content by Discipline
Trending Content
Get JPT articles in your LinkedIn feed and stay current with oil and gas news and technology.