Latest News
-
Current production from the phase is 400 MMcf/D and expected to peak at 700 MMcf/D. A third phase also is slated to come on stream this year.
-
Inspection data management system software can help companies bolster their mechanical integrity programs, but choosing the wrong software can have a lasting impact on a company’s operations. So, what goes into finding the right software for your needs?
-
Poland’s PGNiG is calling for contractors for an LNG terminal expansion and construction of an additional jetty.
-
The jacket, constructed in Texas over 18 months, completed the journey on a 180-m-long barge across the Atlantic Ocean to the Mediterranean site in 28 days, arriving in late January.
-
Trendsetter Engineering completed its 2-year design and build work for Noble Energy’s Leviathan project.
-
The Eagle Ford Shale has reclaimed its standing as one of the most attractive US onshore liquids basins, and for good reason. Does this mean more operators will seek to buy in to the play, and could further consolidation take hold following last year’s big deals?
-
Finding water for hydraulic fracturing and then finding a use for it when it flows back are critical engineering problems to solve in the booming Permian Basin.
-
DCN will execute fabrication, installation, and precommissioning of various components for a gas export pipeline from two platforms in the Dutch North Sea.
-
Teekay Offshore has agreed to a 3-year contract extension with Petrobras for the Piranema Spirit, an FPSO located in the Piranema field offshore Brazil. The agreement, which includes termination rights for Petrobras with 10 months’ advance notice, was signed in January but takes effect this month.
-
DCN Diving has received a contract from Dana Petroleum to execute work offshore the Netherlands. Under the terms of the deal, DCN will perform the fabrication, installation, and precommissioning of various tie-in spools and a flanged connector for Dana’s DP-012 gas export pipeline.
-
The struggle to overcome the challenge of frac hits has led to a critical dialogue about which pathway the shale sector should take. One idea is to simply put the problem at the center of every major decision.
-
UK’s first horizontal shale well has yielded positive results after an initial flow test. But further testing—and fracturing of a second well—will have to come amid a continuation of UK’s stringent regulations on induced seismicity.
Explore Content by Discipline
Trending Content
Get JPT articles in your LinkedIn feed and stay current with oil and gas news and technology.