Optimizing the Deepwater Completion Process Offshore Israel

This paper describes the successful delivery of one ultrahigh-rate gas well (more than 250 MMscf/D) completed in a significant gas field offshore Israel with 7-in. production tubing and an openhole gravel pack (OHGP).

jpt-2018-09-189637hero.jpg

This paper describes the successful delivery of one ultrahigh-rate gas well (more than 250 MMscf/D) completed in a significant gas field offshore Israel with 7-in. production tubing and an openhole gravel pack (OHGP). The Tamar 8 well was completed approximately 4 years after the start of initial production from the Tamar development. Several operational innovations and process improvements were implemented that resulted in a significant reduction in rig time.

Introduction

The Tamar field was discovered in 2009 in 5,505 ft of water at a total depth (TD) of 14,967 ft. Tamar is one of several recent gas discoveries made in the deep waters offshore northern Israel and Cyprus in the Levant Basin (Fig.

×
SPE_logo_CMYK_trans_sm.png
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.