APA
-
The $10.5 billion deepwater project is expected to start production in 2028 as the country’s first offshore development.
-
A newbuild Fast4Ward hull will be used as part of the Block 58 development set for FID prior to year-end.
-
Houston-based independents will combine to form a company with a production total above 500,000 BOE/D and valued at $21 billion.
-
Studies center on subsea wells connected to an FPSO.
-
Suriname's wait to become a significant oil producer may be nearing an end as the French supermajor begins early development studies.
-
Appraisal drilling at Block 58’s Sapakara South find is underway.
-
Good news in Block 53 is offset by disappointing results in Block 58.
-
The operator finds around 180 million bbl at Krabdagu, water at Rasper.
-
Sapakara South flow test encouraging, but Bonboni well result disappoints.
-
Data gathered from the well will be used to inform the next steps for Keskesi appraisal.
Page 1 of 2