FPSO
-
Espirito Santo: Design and Operational Experience of the Use of Steel Risers on a Turret-Moored FPSOThe floating production, storage, and offloading (FPSO) facility Espirito Santo, located offshore Brazil in the Parque das Conchas (BC-10) field, is the world’s first turret-moored FPSO facility to use steel risers for fluid transfer.
-
This paper describes the measures put in place so that the mooring system of the Gryphon Alpha FPSO could be replaced and reconnected on an efficient schedule.
-
Semisubmersible floating production systems (SFPSs) with steel catenary risers (SCRs) are attractive field-development solutions, especially in deeper water of Western Australia. However, SCR design is challenging in the offshore Western Australia environment because of severe cyclonic environments.
-
The SPE Gulf Coast Section’s Project, Facilities, and Construction study group is hosting a series of lectures, “What Have We Learned About Host Selection in Deepwater GOM After 20 Years of Being Off the Shelf?
-
Roughly one-half of global gas reserves are considered stranded gas--uneconomical because of the remote location of potential markets, lack of economic transportation and infrastructure, or the lack of conversion technology. An FPSO with gas to liquids conversion is an option for stranded gas.
-
Good early production caused an FPSO to reach the design topside limit with only five wells connected. A study was undertaken to determine how bottlenecks could be reduced to allow greater production without compromising process safety.
-
This paper compares the main features of the Schiehallion and Quad 204 TMSs, reporting the performance of key components over 15 years of operation.
-
The large number of floating production, storage, and offloading units (FPSOs) commissioned more than a decade ago now require offshore-asset-integrity management and maintenance.
-
The development of compact topside processing plants for floating, production, storage and offloading (FPSO) vessels is a growing industry trend that can reduce operating and capital expenditures over the life of the vessel, a researcher and scientist said recently.
-
Conversion of very large crude carriers to FPSO's can speed time to first oil under the right conditions, there are many considerations in the planning and execution of these conversions.