Phillips 66
-
Phillips and Trafigura JV expected to load VLCCs. The project is in the permitting stage with an FID expected this year.
-
The transaction is expected to close in March. The Liberty Pipeline runs 700 miles between Cushing, Oklahoma and Guernsey, Wyoming.
-
Phillips 66 and partners in two separate joint ventures are building the Red Oak and the Liberty pipeline systems to deliver a total of approximately 750,000 BOPD to the US Gulf Coast with startup of service in early 2021.
-
The need to optimize tank turnaround schedules is as great as it has ever been within the midstream sector, but traditional human-based tank inspections often cut into uptime while introducing safety risks. New robotic applications aim to alleviate these issues.