pre-salt
-
A newbuild hull has been selected for facilities buildout.
-
Petrobras completed a drillstem test (DST) in the Júpiter Discovery Assessment Plan, located in the Santos Basin pre-salt carbonate reservoir.
-
Operators celebrate first major deepwater project sanctioned since the early-2020 oil crash.
-
In its push to boost deepwater production, Petrobras is aiming to launch a leasing tender to build an FPSO described as Brazil’s largest-ever oil platform. Decommissioning work begins in the Campos and the Sergipe-Alagoas Basins.
-
P-68 is Petrobras’ fourth FPSO to begin operations this year following the startups of P-67 at the Lula field and P-76 and P-77 at the Buzios field.
-
Chinese firms stepped in for the majors in Brazil’s two underwhelming offshore auctions.
-
The round included a near-$1 billion signature bonus on a Campos Basin block awarded to a Total-led consortium.
-
Petrobras has awarded TechnipFMC with an engineering, procurement, construction, and installation (EPCI) contract for the Mero 1 pre-salt field, located in the Santos Basin at 2100 m offshore Brazil. The contract covers the engineering, procurement, and construction of all rigid lines, as well as the installation and precommissioning of all the infield risers and the …
-
Petrobras and Shell have brought online the Lula field’s seventh FPSO as the firms continue to ramp up production from the pre-salt Santos Basin.
-
The paper provides a fast-track approach to perform screening assessment of multiple subsea concepts.