After 70 years of production, more than 30% of the Arab C reservoir stock-tank original oil in place has been recovered through various mechanisms including natural depletion, waterflooding, gas lift implementation, and horizontal-well development. Extending production into future years requires a strategic approach focusing on innovative development to target the remaining oil saturation. Integration of a recently acquired, high-resolution 3D-seismic survey complements the data available for subsurface description and characterization, positively affecting reservoir-model history-matching metrics.
Introduction
The large, mature Dukhan field is located onshore Qatar, approximately 80 km west of Doha. The Arab C reservoir interval is a carbonate anticlinal structure lying 5,500 to 7,000 ft below the surface.