Completions
Sponsored
This case study by CNOOC and Halliburton highlights how enhanced multizone sand control treats eight unequal zones in one trip and reduces completion time by 60 hours in Bohai Bay, China.
This paper presents the application of degradable particulate-diverter technology to improve oil production by effectively diverting stimulation treatment fluids away from high-water-cut, high-permeability, high-temperature producing intervals or zones.
This paper focuses on a replicable, quantitative workflow using completions-process simulation software.
-
This paper describes the successful deployment of flexible coiled tubing technology in an oil-producing well of the offshore Frade field in Brazil’s Campos Basin.
-
The Houston-based enhanced geothermal developer scored $1.9 billion in an initial public offering, positioning it to expand projects in Utah and Nevada.
-
A Chinese operator in the Sichuan Basin used high‑frequency pressure monitoring to evaluate frac performance in unconventional wells.
-
Hydraulic fracturing holds great potential in the region, but there are several key questions worth asking as efforts move forward.
-
The authors reach conclusions that the industry should define a standard testing method to improve swelling performance, including validation of repeatability, to complement existing guidelines.
-
This paper presents the development of an advanced simulation tool aimed at providing a better understanding of the complex fluid-displacement phenomena present in well-cementing processes.
-
This paper examines the effects of cement voids and microannuli on the collapse resistance of pipe/cement/pipe systems with void angles ranging from 0º to 70º.
-
This paper describes the evolution of the operator’s initial PWC (perforate, wash, and cement) abandonment projects performed in deepwater Brazil.
-
The multiyear contract with YPF includes electric pumping units and automated stimulation services.
-
Conflict‑driven price gains may be offset by higher costs, supply‑chain risks, and a limited appetite for new drilling activity.