Drilling
The firm's first-quarter rankings evaluate drilling performance across multiple measures, including total drilled measured depth.
After acquiring the block more than a decade ago, Petrobras has finally found oil in the deepwater area of the Equatorial Margin with the Morpho-1 exploration well.
More than 900 drilling and well professionals from 30+ countries gathered at APDT 2026 in Bali to explore how AI, automation, and advanced well technologies are driving safer, smarter, and more efficient drilling across Asia Pacific.
-
The Orca-1 and Marsouin-1 wells have derisked up to 50 Tcf of gas initially in place from the Cenomanian and Albian plays in the BirAllah area, more than sufficient to support a world-scale LNG project, partner Kosmos Energy said.
-
The Sidri 36 appraisal well confirmed the downdip westward extension of the Sidri 23 discovery announced last July by the Italian major.
-
India’s ONGC reported an oil find in Colombia’s Llanos Basin as well as a gas and oil discovery in Brazil’s deepwater Sergipe Alagoas Basin.
-
Development of the Tolmount East discovery will be fast-tracked, the operator said.
-
The field is estimated to hold 19 Tcf, of which 13 Tcf is recoverable, NIOC reported 14 October.
-
Santos Energy said its second and final flow test from the Dorado field suggests potential flow rates of around 30,000 B/D from each Caley reservoir production well.
-
The hybrid power technology cuts fuel consumption and boosts the dynamically positioned rig’s station-keeping reliability, the drilling contractor says.
-
Measured-pressure approaches have offered much promise for some time but have been slow to reach widespread application. A spate of technical developments, deployments, trials, and applications, however, recently has pushed measured-pressure drilling and its nuanced variants to their full potential.
-
This paper presents lessons learned regarding design, testing, and installation of a completely integrated managed-pressure-drilling (MPD) control system on a deepwater drilling rig.
-
This paper presents the design considerations, methodology, and results of two deepwater MPC operations conducted to cement production casing strings within a target operating window of approximately three-tenths of a pound.