Drilling
This paper presents a study that confirms glass-reinforced-epoxy-lined tubing as a reliable, cost-effective solution for long-term water-injection service in moderate-salinity offshore environments.
This study aims to systematically assess casing integrity and corrosion risks associated with CO2 injection in oil-recovery operations.
This paper presents findings reinforcing the argument that acid fracturing is a strong alternative stimulation method to improve productivity in the Austin Chalk formation.
-
This paper discusses the successful application of managed-pressure drilling (MPD) in the basin with reduction in risks and well costs.
-
This paper describes the drilling of high-pressure/high-temperature (HP/HT) deepwater wells through an ultranarrow pore-pressure fracture gradient (PPFG) window by means of technology application and strict procedural control.
-
This paper discusses how managed-pressure-drilling (MPD) technology led to cost savings in two wells drilled in the Hai Thach gas field offshore southern Vietnam.
-
Noble’s first row of wells in its massive Mustang project is helping increase the operator’s DJ Basin output, and similar results are soon expected in the Delaware Basin.
-
The contract is helping to solidify Europe’s offshore sector as the focal point for the rise of automated drilling technology.
-
Examples of evolution in well construction during the past several years include new horizontal-well applications, breakthroughs in bit and directional-drilling technology, synthetic fluids, fracture-stimulation advancements, managed-pressure drilling, and the digital revolution.
-
Time spent on bottom drilling is only approximately 10% of the time consumed by drilling operations, but this still provides a significant opportunity for savings if it can be reduced.
-
Drilling systems automation requires a digital backbone. One segment of that backbone is the interval between the drill bit and the surface. Wired pipe removes both the bandwidth and latency barriers of the available measurement-while-drilling telemetry systems.
-
A drilling team has focused on increasing lateral lengths in the Marcellus Shale. The team determined which operational practices would need to be revised in order to drill and case laterals in excess of 18,000 ft.
-
In this paper, the application of a real-time T&D model is demonstrated. The process of T&D analysis was automated, and the time and cost required to run physical models offline was reduced or, in some cases, eliminated.